16 June 2019 | Validation of a Coupled CFD Model for Evaluating Floating Tidal Systems | Brown, SA; Ransley, EJ; Greaves, DM; et al. |
16 June 2019 | CFD Analysis on Wave Load Mitigation Effect of a Perforated Wall on Offshore Structure | Chen, B; Wang, L; Ning, D; et al. |
18 September 2014 | Wave energy testing in Cornwall: Were the waves during winter 2013/14 exceptional? | Ashton, IGC; Johanning, L |
6 August 2016 | Analytical performance assessment of a novel active mooring system for load reduction in marine energy converters | Luxmoore, JF; Grey, S; Newsam, D; et al. |
31 January 2016 | Applicability of offshore mooring and foundation technologies for marine renewable energy (MRE) device arrays | Karimirad, M; Johanning, L; Koushan, K; et al. |
15 June 2018 | Numerical Investigation on Hydrodynamic Performance of a WEC Array Integrated Into a Pontoon | Zhao, X; Ning, D; Johanning, L; et al. |
4 July 2019 | Experimental modelling of a parachute-type tidal energy converter | Rinaldi, G; Carne, B; Johanning, L |
29 July 2019 | Optimising the FDM additive manufacturing process to achieve maximum tensile strength: a state-of-the-art review | Gordelier, TJ; Thies, P; Turner, L; et al. |
1 September 2019 | The O&M driven design of a multi-row platform tidal project | Rinaldi, G; Crossley, G; Parkinson, R; et al. |
1 March 2014 | Best practice report - installation procedures | Maisondieu, C; Johanning, L; Weller, S |