27 January 2015 | Mooring and Foundation Module Framework for DTOcean Tool | Johanning, L; Weller, S; Victor, L; et al. |
27 January 2014 | A comprehensive assessment of the applicability of available and proposed offshore mooring and foundation technologies and design tools for array applications | Weller, S; Hardwick, J; Johanning, L; et al. |
25 April 2014 | Specific requirements for MRE foundation analysis | Heath, J; Jensen, R; Arguello, J; et al. |
1 June 2013 | Cross border laboratory and field test procedures: best practice report | Weller, S; Johanning, L |
1 June 2013 | Guidance on the use of synthetic fibre ropes for marine energy devices | Weller, S; Davies, P; Johanning, L; et al. |
1 January 2014 | Best practice report – operation and maintenance requirements | Weller, S; Maisondieu, C; Johanning, L; et al. |
1 September 2013 | Best practice report – mooring of floating marine renewable energy devices | Weller, S; Johanning, L; Davies, P |
13 March 2015 | Fibre Ropes for Taut Mooring Lines for Marine Energy Converters (Fibre Taut 2) | Dorenbusch, J; Canedo, J; Leao, A; et al. |
15 December 2014 | Fibre Ropes for Taut Mooring Lines for Marine Energy Converters (FibreTaut1) | Dorenbusch, J; Canedo, A; Leao, A; et al. |
1 March 2014 | Best practice report - installation procedures | Maisondieu, C; Johanning, L; Weller, S |