dc.description.abstractFloating offshore wind needs to go from pre commercial phase to full commercial use if it’s full benefits are to be realised. The port and installation requirements for barge, semi submersible and Spar substructure types are understood, though more research is needed to reduce cost. Floating Wind Tension Leg Platforms (TLPs) have constraints on tow out intact stability and complications in installing the tension moorings. The paper will review the port and installation requirements of TLPs as floating wind substructures. The TLP has the advantages over other substructure types for low in place motions and minimum area taken up on the seabed. There is experience from the offshore oil and gas industry of TLPs which can assist in developing cost effective TLP designs for floating wind. The priorities are the turbine fit out port and the vessels required for TLP offshore installation. Cost reduction during the port and installation phases are based on the best techniques from the offshore oil and gas industry, from bottom fixed wind turbines and the installation of other floating wind types. Installation methods considered are: variable draft between tow out and operations, piece small installation offshore and fitting temporary buoyancy for the tow out phase. Design for installation includes expanding the weather window in which the TLP floating substructure can be transported to site and configurations to facilitate mooring. The simplification of installation methodology will reduce time spent offshore and will minimise risks to personnel.en_GB
dc.identifier.citationFloating Offshore Wind 2022 conference, Aberdeen, Scotland, 12 -13 October 2022en_GB
dc.identifier.urihttp://hdl.handle.net/10871/131320
dc.language.isoenen_GB
dc.publisherRenewable UK / Scottish Renewablesen_GB
dc.relation.urlhttps://events.renewableuk.com/fow22-overview
dc.rights© 2022 Renewable UK / Scottish Renewables
dc.titlePort and installation constraints of Tension Leg Platforms (TLP) floating wind turbinesen_GB
dc.typeConference paperen_GB
dc.date.available2022-10-19T08:38:23Z
exeter.locationAberdeen
dc.descriptionThis is the final version.en_GB
dc.rights.urihttp://www.rioxx.net/licenses/all-rights-reserveden_GB
dcterms.dateAccepted2022-05-10
rioxxterms.versionAMen_GB
rioxxterms.licenseref.startdate2022-05-10
rioxxterms.typeConference Paper/Proceeding/Abstracten_GB
refterms.dateFCD2022-10-18T15:20:00Z
refterms.versionFCDVoR
refterms.dateFOA2022-10-19T12:18:28Z
refterms.panelBen_GB
pubs.name-of-conferenceFloating Wind 2022 Conference, RenewableUK and Scottish Renewables


Files in this item

This item appears in the following Collection(s)

Show simple item record