Show simple item record

dc.contributor.authorWeller, S.D.
dc.contributor.authorDavies, P.
dc.contributor.authorVickers, Andrew
dc.contributor.authorJohanning, Lars
dc.date.accessioned2015-06-30T10:14:26Z
dc.date.issued2014-06-01
dc.description.abstractThe utilisation of synthetic mooring ropes for marine renewable energy (MRE) devices is a recent occurrence. Despite current use in the offshore industry, MRE mooring components are typically subjected to highly dynamic loads, necessitating the detailed characterisation of operational and long-term component performance for lifecycle analysis and operations management. To address the uncertainties associated with synthetic mooring components in this application, tension experiments have been conducted on nylon 6 parallel-stranded rope samples at IFREMER, France and the University of Exeter, UK under the consortium MERiFIC (Marine Energy in Far Peripheral and Island Communities). Measurements are reported from harmonic loading tests with different initial bedding-in levels used to investigate the influence of load history on the immediate dynamic properties of the rope. Two irregular load regimes were also applied based on mooring tensions recorded by the South West Mooring Test Facility (SWMTF). Datasets are provided to facilitate the development of rope modelling tools. For the load regimes studied it was found that the operational performance of the rope is strongly influenced by the instantaneous load-strain characteristic. This study provides unique insight into the stiffness and damping properties of synthetic rope in the context of loading regimes relevant to MRE devices.en_GB
dc.description.sponsorshipEuropean Regional Development Fund - Interreg IV-A programmeen_GB
dc.description.sponsorshipERDF Convergence programmeen_GB
dc.description.sponsorshipSouth West Regional Development Agencyen_GB
dc.identifier.citationVol. 83, pp. 111 - 124en_GB
dc.identifier.doi10.1016/j.oceaneng.2014.03.010
dc.identifier.urihttp://hdl.handle.net/10871/17711
dc.language.isoenen_GB
dc.publisherElsevieren_GB
dc.subjectSynthetic mooring lineen_GB
dc.subjectNylon 6en_GB
dc.subjectParallel-strand ropeen_GB
dc.subjectLoad historyen_GB
dc.subjectOperational performanceen_GB
dc.titleSynthetic rope responses in the context of load history: Operational performanceen_GB
dc.typeArticleen_GB
dc.date.available2015-06-30T10:14:26Z
dc.identifier.issn0029-8018
dc.descriptionCopyright © 2014 Elsevier. NOTICE: this is the author’s version of a work that was accepted for publication in Ocean Engineering. Changes resulting from the publishing process, such as peer review, editing, corrections, structural formatting, and other quality control mechanisms may not be reflected in this document. Changes may have been made to this work since it was submitted for publication. A definitive version was subsequently published in Ocean Engineering (2014), DOI: 10.1016/j.oceaneng.2014.03.010en_GB
dc.identifier.journalOcean Engineeringen_GB


Files in this item

This item appears in the following Collection(s)

Show simple item record