Show simple item record

dc.contributor.authorAhmadi, A
dc.contributor.authorBehzadian, Kourosh
dc.contributor.authorArdeshir, Abdollah
dc.contributor.authorKapelan, Zoran
dc.date.accessioned2015-11-26T15:16:49Z
dc.date.issued2016-07-01
dc.description.abstractThis paper presents a comprehensive framework to manage the main risk events of highway construction projects within three stages: (1) identification of potential risks, (2) assessment and prioritisation of identified risks based on fuzzy FMEA; (3) identification of appropriate response. The main criteria analysed for prioritising potential risk events are cost, time and quality which are quantified and combined using fuzzy AHP. A new expert system is suggested for identifying an appropriate risk response strategy for a risk event based on risk factor, control number and risk allocation. The best response action for a risk event is then identified with respect to the same criteria using “scope expected deviation” (SED) index. The proposed methodology is demonstrated for management of risk events in a construction project of Bijar-Zanjan highway in Iran. For the risk event of “increase in tar price”, deviation from the target values of the criteria is analysed for business-as-usual state plus two risk response actions using SED index. The results show that the response action of “changing paving construction technology from asphalt pavement to RCC pavement” can successfully cope with the risk event of “increase in tar price” and have the minimum deviation.en_GB
dc.identifier.doi10.3846/13923730.2015.1068847
dc.identifier.urihttp://hdl.handle.net/10871/18782
dc.language.isoenen_GB
dc.publisherTaylor & Francisen_GB
dc.rights.embargoreasonPublisher's policy.en_GB
dc.rightsThis is the author accepted manuscript. The final version is available from Taylor & Francis via the DOI in this record.
dc.titleComprehensive Risk Management using Fuzzy FMEA and MCDA Techniques in Highway Construction Projectsen_GB
dc.typeArticleen_GB
dc.identifier.issn1392-3730
dc.identifier.journalJournal of Civil Engineering and Managementen_GB
refterms.dateFOA2017-07-01T23:00:00Z


Files in this item

This item appears in the following Collection(s)

Show simple item record