dc.description.abstract | The construction of water transfer projects can have a considerable impact on the
operation of the receiving reservoir. This study investigates the change of the objective
tradeoffs in multi-objective reservoir operation problems due to the introduction of water
transfer using a case study of the East-to-West Water Transfer project in northeastern China.
Two optimization cases are constructed to analyze the tradeoff changes: a base case with no
water transfer which considers four objectives, i.e., minimizing industry water shortage,
minimizing agriculture water shortage, minimizing water spillage, and maximizing ecological
satisfaction; a future post-construction case which considers an additional objective to
minimize the amount of water transferred. Results obtained from the case study show
increasing water transfer substantially reduces the intensity of the competition between
industrial and agricultural water shortages, and the objective tradeoffs among water spillage,
ecological satisfaction and agricultural shortage index are substantially changed because of
water transfer. In addition, the amount of water transferred with high efficiency regarding
each objective is identified, and three solutions of different orders of magnitude in diverted
water have been recommended for informed decision making considering efficiency and
benefit. This study implies that many-objective visual analytics can be used to determine the
optimal amount of water transferred in terms of water efficiency revealed in different
objective tradeoff spaces. | en_GB |
dc.description.sponsorship | This study was supported by the National Natural Science Foundation of China (Grant Nos. 51320105010, 51279021, and 51409043), and by the Ministry of Water Resources of China (Grant No. 201401014-2). The fourth author was partially supported by the Engineering and Physical Sciences Research Council (EPSRC) under the Building Resilience into Risk Management project (EP/N010329/1). | en_GB |
dc.identifier.citation | Vol. 143 (8), article 05017006 | en_GB |
dc.identifier.doi | 10.1061/(ASCE)WR.1943-5452.0000800 | |
dc.identifier.uri | http://hdl.handle.net/10871/26327 | |
dc.language.iso | en | en_GB |
dc.publisher | American Society of Civil Engineers | en_GB |
dc.subject | Many-objective optimization | en_GB |
dc.subject | Objective tradeoffs | en_GB |
dc.subject | Reservoir operation | en_GB |
dc.subject | Visual analytics | en_GB |
dc.subject | Water efficiency | en_GB |
dc.subject | Water transfer | en_GB |
dc.title | Use of many-objective visual analytics to analyze water supply objective tradeoffs with water transfer | en_GB |
dc.type | Article | en_GB |
dc.identifier.issn | 1943-5452 | |
dc.description | This is the author accepted manuscript. The final version is available from ASCE via the DOI in this record. | |
dc.identifier.journal | Journal of Water Resources Planning and Management | en_GB |